May. 3rd, 2014 07:45 am( New main floor sketch )
I'm not sure how this picture option is working.
Notes about ze plan, ze plan
1. Restoring 3rd (middle) window in master bedroom (top floor)
2. Move powder away from din/kit! As plumbing is complete gut and all ceilings coming out anyway, plus most if not all walls, no reason to keep bathroom in existing location on main floor. Downsides: harder to vent, no window
3. Utility room on main floor - moved powder room opens option to have utility room, hvac, closet #2, on main floor
4. Contractor is comfortable with tankless water heater and options such as combining with hvac
I'm not sure how this picture option is working.
Notes about ze plan, ze plan
1. Restoring 3rd (middle) window in master bedroom (top floor)
2. Move powder away from din/kit! As plumbing is complete gut and all ceilings coming out anyway, plus most if not all walls, no reason to keep bathroom in existing location on main floor. Downsides: harder to vent, no window
3. Utility room on main floor - moved powder room opens option to have utility room, hvac, closet #2, on main floor
4. Contractor is comfortable with tankless water heater and options such as combining with hvac