Not so much going on - I've paid 3/4 of the payments, though I could argue I've paid sooner than planned as this was supposed to be a post-framing payment...but the basement is still floorless. I swapped some emails with Jordan this weekend, he admitted he may have been a tad optimistic about the schedule. I have wires, coax and ethernet too, but still no fixtures or drywall.

He thinks he's getting me a list of change orders soon.

CO insulation floors 2-3 $1,340.00
Spray foam (1") F/B $900.00
Exterior doors $5,000.00 ???
hvac basement $10,000.00 ???
Floors mat (possible more labor) $1,722.00
Appliances main floor
Appliances basement
Possible pavers driveway? Bid pending

I don't have a clear idea of when I might move in - he says once drywall goes up it's super fast. Ok, but how long for the floors, fixtures, then silly paint? Then what about running water, a/c, and anything that has to do with the basement?

We have all the permits now, but need a final inspection before "close in" (the drywall).

I have all these things I actually have to do some day, like make that collage of "before" pictures, get furniture, rent places out, just...all the little things that need doing.

However, I do have a fuckton of annual leave, more than a week a month, of use or lose. Plus the niceness of not having to move in 100 deg heat?

Profile

vicarz: (Default)
vicarz

May 2018

S M T W T F S
   1234 5
6789101112
13141516171819
20212223242526
2728293031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 31st, 2026 05:42 pm
Powered by Dreamwidth Studios